Intel Razor Lake Will Use TSMC’s 2nm N2X Process, Leaving AMD in a Difficult Position
The latest rumors suggest that Intel‘s next two generations, Nova Lake and Razor Lake, will use TSMC’s 2nm N2X process, giving it an important role in their production.
With Intel Nova Lake on the horizon and the company close to starting mass production of its chips, some very interesting information has appeared. At first, it was believed that this new range would depend only on Intel’s 18A process, but recent leaks suggested that TSMC’s N2P process would also play a key role.
Intel’s Razor Lake Plans Could Make TSMC Chip Supply Harder for AMD
In fact, Commercial Times has shared new information in recent hours (thanks Wccftech). Nova Lake laptop versions may not arrive until the Razor Lake-HX generation. It was also confirmed that Nova Lake chips will introduce bLLC technology to compete with AMD’s X3D chips.
However, the most interesting detail is that Razor Lake chips also seem set to use this split between two processes. More specifically, Intel would use its own 18A process alongside TSMC’s external N2X process.
This not only puts Intel in a better position, but also directly affects AMD in a negative way. Basically, it prevents AMD from securing extra production capacity at TSMC, which is already limited at the moment. As a result, AMD would not be able to rely on the Taiwanese giant to help with the production of its chips.
The only comfort for AMD is that Intel’s dependence on TSMC shows that its 18A process is not as refined as the company would like. Therefore, at least for now, AMD still has a certain advantage.
Get more eTeknix in GoogleAdd us as a preferred source and our stories show up more often in Google's Top Stories.











